Adding a Cost Code to a Project Job
Cost codes must be added to a job before they can be used for budget and cost tracking.
- Navigate to and click on the project you want to update.
- Within the project screen, click on Preconstruction and then Jobs.
- You can then update the job by clicking on the menu button (three dots) under the Options column, and then clicking Edit.
- Once on the Edit Job screen, click Next to navigate to Import Cost Codes, and select the cost code you would like to add to the selected job.
- Click Submit to save changes.